Institutional

intro
CHU Saint-Justine, Montréal

CHU Saint-Justine, Montréal

Description

76,000 sq. ft. new institutional roof installation project in phase 1, and 126,500 sq. ft. in phase 2

System

Elastomeric membrane, Heated rubber membrane

Duration

1 year (expected to be completed during winter 2016)

Challenges

This project, worth around $4M, has been the largest contract ever obtained by LK Roofing. We are very proud of it, as it helped improve our own organization, management and coordination throughout the company. 

MONT-SAINT-LOUIS COLLEGE, MONTREAL

MONT-SAINT-LOUIS COLLEGE, MONTREAL

Description

16,700 sq. ft.  institutional re-roofing installation project

System

White Elastomeric membrane

Duration

2 months

Challenges

Nice re-roofing projet with white elastomeric membrane and somes sheet metal working. 

NOTRE-DAME-DE-LOURDES SCHOOL

NOTRE-DAME-DE-LOURDES SCHOOL

Description

12,200 sq. ft. institutional re-roofing installation project

System

PVC Membrane

Duration

1 months

Challenges

None. This project was straightforward and easy.

HEC, Montreal

HEC, Montreal

Description

Institutional re-roofing and servicing project

System

Elastomeric membrane

Duration

1 month

Challenges

None. This project was straightforward and went well. 

Montreal Neurological Institute, Montreal

Montreal Neurological Institute, Montreal

Description

217,580 sq. ft. new institutional roof installation project

System

Elastomeric membrane, Heated rubber membrane

Duration

1 year

Challenges

This project proved to be challenging because several trades had to coordinate their work. This required much planning and communication between the workers on site to meet the project’s deadlines.

Rousseau Arena, Boisbriand

Rousseau Arena, Boisbriand

Description

3,200 sq. ft. LEED new institutional roof installation project

System

TPO membrane, elastomeric membrane

Duration

4 months

Challenges

There’s another project we are very proud of! White roofs are always amazing! It’s been challenging and interesting to match the TPO membrane on the flat part of the roof, and the white elastomeric membrane on the low-slope part.

Canadian Space Agency, Montreal

Canadian Space Agency, Montreal

Description

24,000 sq. ft. institutional re-roofing project

System

Elastomeric membrane

Duration

4 months

Challenges

Our job was to remove the old heated rubber membrane and replace it with the elastomeric membrane chosen by the client, and our master roofers managed to complete it perfectly.

Loyola Campus, Concordia, Montreal

Loyola Campus, Concordia, Montreal

Description

32,000 sq. ft. LEED new institutional roof installation project

System

Elastomeric membrane

Duration

5 months

Challenges

The main challenge was to deal with the slopes of the buildings, involving many drains that made it loner to install the membrane.