Commercial

Bell Data Center, Buckingham

Description:
46,900 sq. ft. commercial new roof installation project

System:
Elastomeric Membrane

Duration:
3 months

Challenges:
This particular commercial building required optimal waterproofing and, consequently, a high-quality installation to protect their goods. We were up to it, as we are always committed to offering the best possible service to our clients.

TOYOTA, MIRABEL

Description:
8,200 sq. ft. new commercial roof installation project

System:
TPO membrane

Duration:
3 weeks

Challenges:
None. This project was straightforward and easy.

TIMEX REALTY CORPORATION

Description:
23,100 sq. ft. commercial re-roofing installation project

System:
White Elastomeric membrane

Duration:
1 month

Challenges:
None. This project was straightforward and easy.

GBD Construction, Saint-Eustache

Description:
39,000 sq. ft. new commercial roof installation project

System:
TPO membrane

Duration:
1 month

Challenges:
Because the building had multiple roof sections, it was crucial to come up with well-thought-out strategies to face the harsh weather encountered during the project. A careful planning made our team meet the challenge and turn it into another satisfied LK Roofing client.

Clinique de l’œil, Boisbriand

Description:
13,500 sq. ft. commercial new roof installation project

System:
Elastomeric Membrane

Duration:
2 weeks

Challenges:
None. This project went particularly well on every level.

General Dynamics, Le Gardeur

Description:
Commercial Re-roofing, repair and maintenance project

System:
Asphalt and gravel membrane with a heater rubber membrane

Duration:
2 weeks

Challenges:
This was a highly secured project because of the chemicals on site. Our team managed to respect these high security standards as a part of our commitment towards our clients.

Sports Center, Sainte-Agathe-des-Monts

Description:
34,800 sq. ft. commercial re-roofing project

System:
Elastomeric Membrane

Duration:
1 month

Challenges:
The main challenge was to remove the existing roof as it was very old and harder to tear off.

Centre Récréo-Aquatique de Saint-Hyacinthe

Description:
37,600 sq. ft. new commercial roof installation project

System:
PVC Membrane

Duration:
2 months

Challenges:
This project was launched in winter and required difficult snow and ice removal on the roof. Despite the harsh weather, LK Roofing managed to deliver on time.

Fairview Project, Pointe-Claire

Description:
40,000 sq. ft. commercial re-roofing project

System:
Elastomeric Membrane

Duration:
2 months

Challenges:
None. This project was straightforward and easy.

Go to Top