Commercial

Toiture élastomère inversée – Toit-terrasse

Description:
La toiture élastomère en configuration inversée est une solution idéale pour les toits-terrasses. Elle offre une excellente protection de la membrane, une durabilité accrue et permet l’aménagement d’espaces verts et de zones de détente accessibles, tout en assurant une étanchéité optimale du bâtiment.

Toiture blanche d’un bâtiment industriel équipée de systèmes HVAC, réalisée par un entrepreneur en toiture spécialisé en revêtements à haute performance énergétique.

Bell Data Center, Buckingham

Description:
46,900 sq. ft. commercial new roof installation project

System:
Elastomeric Membrane

Duration:
3 months

Challenges:
This particular commercial building required optimal waterproofing and, consequently, a high-quality installation to protect their goods. We were up to it, as we are always committed to offering the best possible service to our clients.

TOYOTA, MIRABEL

Description:
8,200 sq. ft. new commercial roof installation project

System:
TPO membrane

Duration:
3 weeks

Challenges:
None. This project was straightforward and easy.

TIMEX REALTY CORPORATION

Description:
23,100 sq. ft. commercial re-roofing installation project

System:
White Elastomeric membrane

Duration:
1 month

Challenges:
None. This project was straightforward and easy.

GBD Construction, Saint-Eustache

Description:
39,000 sq. ft. new commercial roof installation project

System:
TPO membrane

Duration:
1 month

Challenges:
Because the building had multiple roof sections, it was crucial to come up with well-thought-out strategies to face the harsh weather encountered during the project. A careful planning made our team meet the challenge and turn it into another satisfied LK Roofing client.

Clinique de l’œil, Boisbriand

Description:
13,500 sq. ft. commercial new roof installation project

System:
Elastomeric Membrane

Duration:
2 weeks

Challenges:
None. This project went particularly well on every level.

General Dynamics, Le Gardeur

Description:
Commercial Re-roofing, repair and maintenance project

System:
Asphalt and gravel membrane with a heater rubber membrane

Duration:
2 weeks

Challenges:
This was a highly secured project because of the chemicals on site. Our team managed to respect these high security standards as a part of our commitment towards our clients.

Sports Center, Sainte-Agathe-des-Monts

Description:
34,800 sq. ft. commercial re-roofing project

System:
Elastomeric Membrane

Duration:
1 month

Challenges:
The main challenge was to remove the existing roof as it was very old and harder to tear off.

Centre Récréo-Aquatique de Saint-Hyacinthe

Description:
37,600 sq. ft. new commercial roof installation project

System:
PVC Membrane

Duration:
2 months

Challenges:
This project was launched in winter and required difficult snow and ice removal on the roof. Despite the harsh weather, LK Roofing managed to deliver on time.

Fairview Project, Pointe-Claire

Description:
40,000 sq. ft. commercial re-roofing project

System:
Elastomeric Membrane

Duration:
2 months

Challenges:
None. This project was straightforward and easy.

Go to Top