Toiture élastomère inversée – Toit-terrasse
Description:
La toiture élastomère en configuration inversée est une solution idéale pour les toits-terrasses. Elle offre une excellente protection de la membrane, une durabilité accrue et permet l’aménagement d’espaces verts et de zones de détente accessibles, tout en assurant une étanchéité optimale du bâtiment.
Bell Data Center, Buckingham
Description:
46,900 sq. ft. commercial new roof installation project
System:
Elastomeric Membrane
Duration:
3 months
Challenges:
This particular commercial building required optimal waterproofing and, consequently, a high-quality installation to protect their goods. We were up to it, as we are always committed to offering the best possible service to our clients.
TOYOTA, MIRABEL
Description:
8,200 sq. ft. new commercial roof installation project
System:
TPO membrane
Duration:
3 weeks
Challenges:
None. This project was straightforward and easy.
TIMEX REALTY CORPORATION
Description:
23,100 sq. ft. commercial re-roofing installation project
System:
White Elastomeric membrane
Duration:
1 month
Challenges:
None. This project was straightforward and easy.
GBD Construction, Saint-Eustache
Description:
39,000 sq. ft. new commercial roof installation project
System:
TPO membrane
Duration:
1 month
Challenges:
Because the building had multiple roof sections, it was crucial to come up with well-thought-out strategies to face the harsh weather encountered during the project. A careful planning made our team meet the challenge and turn it into another satisfied LK Roofing client.
Clinique de l’œil, Boisbriand
Description:
13,500 sq. ft. commercial new roof installation project
System:
Elastomeric Membrane
Duration:
2 weeks
Challenges:
None. This project went particularly well on every level.
General Dynamics, Le Gardeur
Description:
Commercial Re-roofing, repair and maintenance project
System:
Asphalt and gravel membrane with a heater rubber membrane
Duration:
2 weeks
Challenges:
This was a highly secured project because of the chemicals on site. Our team managed to respect these high security standards as a part of our commitment towards our clients.
Sports Center, Sainte-Agathe-des-Monts
Description:
34,800 sq. ft. commercial re-roofing project
System:
Elastomeric Membrane
Duration:
1 month
Challenges:
The main challenge was to remove the existing roof as it was very old and harder to tear off.
Centre Récréo-Aquatique de Saint-Hyacinthe
Description:
37,600 sq. ft. new commercial roof installation project
System:
PVC Membrane
Duration:
2 months
Challenges:
This project was launched in winter and required difficult snow and ice removal on the roof. Despite the harsh weather, LK Roofing managed to deliver on time.
Fairview Project, Pointe-Claire
Description:
40,000 sq. ft. commercial re-roofing project
System:
Elastomeric Membrane
Duration:
2 months
Challenges:
None. This project was straightforward and easy.