CHU Saint-Justine, Montréal
Description:
76,000 sq. ft. new institutional roof installation project in phase 1, and 126,500 sq. ft. in phase 2
System:
Elastomeric membrane, Heated rubber membrane
Duration:
1 year (expected to be completed during winter 2016)
Challenges:
This project, worth around $4M, has been the largest contract ever obtained by LK Roofing. We are very proud of it, as it helped improve our own organization, management and coordination throughout the company.

Rousseau Arena, Boisbriand
Description:
3,200 sq. ft. LEED new institutional roof installation project
System:
TPO membrane, elastomeric membrane
Duration:
4 months
Challenges:
There’s another project we are very proud of! White roofs are always amazing! It’s been challenging and interesting to match the TPO membrane on the flat part of the roof, and the white elastomeric membrane on the low-slope part.

Loyola Campus, Concordia, Montreal
Description:
32,000 sq. ft. LEED new institutional roof installation project
System:
Elastomeric Membrane
Duration:
5 months
Challenges:
The main challenge was to deal with the slopes of the buildings, involving many drains that made it loner to install the membrane.

Canadian Space Agency, Montreal
Description:
24,000 sq. ft. institutional re-roofing project
System:
Elastomeric Membrane
Duration:
4 months
Challenges:
Our job was to remove the old heated rubber membrane and replace it with the elastomeric membrane chosen by the client. Our master roofers managed to complete it perfectly.

Montreal Neurological Institute, Montreal
Description:
217,580 sq. ft. new institutional roof installation project
System:
Elastomeric membrane, Heated rubber membrane
Duration:
1 year
Challenges:
This project proved to be challenging because several trades had to coordinate their work. This required much planning and communication between the workers on site to meet the project’s deadlines.

HEC, Montreal
Description:
Institutional re-roofing and servicing project
System:
Elastomeric membrane
Duration:
1 month
Challenges:
None. This project was straightforward and went well.

NOTRE-DAME-DE-LOURDES SCHOOL
Description:
12,200 sq. ft. institutional re-roofing installation project
System:
PVC Membrane
Duration:
1 month
Challenges:
None. This project was straightforward and easy.

MONT-SAINT-LOUIS COLLEGE, MONTREAL
Description:
16,700 sq. ft. institutional re-roofing installation project
System:
White Elastomeric membrane
Duration:
2 months
Challenges:
Nice re-roofing projet with white elastomeric membrane and somes sheet metal working.